November 23, 2026

TechnipFMC wins two Longtail contracts worth up to US$1.25B

Sharing is caring!

ExxonMobil Guyana has handed TechnipFMC two contracts for the Longtail development — up to US$1.25 billion of subsea work, the company’s eighth greenfield project offshore Guyana.

  • The bigger contract, US$500 million to $1 billion, covers the full subsea production system — Subsea 2.0 trees, manifolds and controls.
  • The second, US$75–$250 million, covers flexible production risers, the same kind used on Payara and Yellowtail.
  • Both awards were already counted in TechnipFMC’s order intake in earlier quarters — this is a contract announcement, not new bookings.
  • Longtail is the US$12.5 billion development approved Nov 12 — the first Stabroek project aimed at gas and condensate, production expected 2030.
  • The FPSO will handle about 1.2 billion cubic feet of gas a day and up to 250,000 barrels of condensate, from 27 production wells and 18 gas-injection wells.

TechnipFMC keeps winning in Guyana. The company announced Thursday it has landed two more contracts from ExxonMobil Guyana for the Longtail development — worth up to US$1.25 billion combined. Its subsea boss, Jonathan Landes, called it “our eighth greenfield project together” with ExxonMobil Guyana.

The big one is the subsea production system: US$500 million to $1 billion for project management, engineering and manufacturing, including its Subsea 2.0 trees, manifolds and control systems. The smaller one, US$75–$250 million, is for flexible production risers — the pipes that carry oil and gas from the seabed up to the floating production vessel — using the same technology already running on Payara and Yellowtail.

One thing to keep straight: this is not new money on TechnipFMC’s books. The company said both awards were already counted in its order intake in previous quarters. The announcement confirms the work, it doesn’t add to the order book.

Longtail is the eighth development in the Stabroek Block and the first aimed at gas and condensate rather than oil. It got government approval and ExxonMobil’s final investment decision on Nov 12 — a US$12.5 billion project in the southeastern Stabroek Block, with production expected in 2030. This follows the Longtail story from earlier this week — Saipem on the subsea work, SBM Offshore building the FPSO.

When it runs, the floating vessel will process about 1.2 billion cubic feet of gas a day and up to 250,000 barrels of condensate from 45 wells — 27 producing, 18 injecting gas back underground. At first, the gas gets pumped back down rather than sold, though the project keeps the door open for exports later. ExxonMobil Guyana holds 45% of the block, Hess (now Chevron) 30%, and CNOOC 25%.

About The Author

Leave a Reply

Your email address will not be published. Required fields are marked *